 |
A two part project.
Prior to our construction at this canoe launch, there was only a muddy otter slide for people to use to access the river.
Starting below water level and continuing to the parking lot, we installed a cut stone staircase.
Cutting into the bank for protection, a set of lasting and very accessable steps were complete.
|
 |