Red River Gorge Trail Crew

Bison Way Trail Head Project
A new parking area was built after the new bridge was installed here close to Gladie. Bison Way was subsequentley routed down to meet this new access point. All the signs had to be erected as well as a small foot bridge to cross from the lot onto the hillside trail head. Making this a lasting, maintenance free area was a priorty so we used cut stones to make the first ascent on this heavily used section. This project was near and dear to us because all the work was done in one location -- allowing us to see the fruits of our labor in a well defined manner.

back to gallery
HOME   •   CALENDAR   •   FAQ   •   LINKS   •   MAPS   •   PICTURES   •   REQUEST INFO   •   SIGN UP!   •   USFS REGULATIONS   •   WEATHER